| + | ====== A Guide to Fabric-Formed Concrete ====== | ||
| + | ### | ||
| + | <fs medium>// | ||
| + | ### | ||
| + | <columns 100% 33.333% 33.333% - > | ||
| + | |||
| + | ==== TABLE ==== | ||
| + | #;; | ||
| + | [[fabwiki: | ||
| + | General Objectives in Fabric-formed Building\\ | ||
| + | How fabric formwork affects concrete quality\\ | ||
| + | Causes of failures\\ | ||
| + | Planning for Safety\\ | ||
| + | Relationship of architect, engineer and contractor\\ | ||
| + | Measurement and payment for formwork\\ | ||
| + | How the architect-engineer can reduce form costs\\ | ||
| + | [[fabwiki: | ||
| + | Development of a basic system\\ | ||
| + | Key areas of cost reduction\\ | ||
| + | Planning for maximum reuse\\ | ||
| + | Economical form construction\\ | ||
| + | Setting and stripping\\ | ||
| + | Other costs affected by formwork plan\\ | ||
| + | Planning examples\\ | ||
| + | [[fabwiki: | ||
| + | Fabric\\ | ||
| + | Lumber\\ | ||
| + | Engineered wood products\\ | ||
| + | Plywood\\ | ||
| + | Other framing and facing materials\\ | ||
| + | Insulation and insulating forms\\ | ||
| + | Hardware and fasteners\\ | ||
| + | Prefabricated forms\\ | ||
| + | Shoring and scaffolding\\ | ||
| + | [[fabwiki: | ||
| + | Vertical loads\\ | ||
| + | Lateral pressure of fresh concrete\\ | ||
| + | Lateral loads\\ | ||
| + | Other loads\\ | ||
| + | [[fabwiki: | ||
| + | Notation\\ | ||
| + | Basic Simplifications\\ | ||
| + | Beam formulas\\ | ||
| + | Design criteria\\ | ||
| + | Bearing examples\\ | ||
| + | Wall, slab and beam form design\\ | ||
| + | Form accessories\\ | ||
| + | Column form design\\ | ||
| + | Shoring and scaffolding\\ | ||
| + | Bracing for lateral loads\\ | ||
| + | Camber and adjustment for settlement\\ | ||
| + | #;; | ||
| + | < | ||
| + | |||
| + | ==== OF ==== | ||
| + | #;; | ||
| + | [[fabwiki: | ||
| + | Joists, studs, beams\\ | ||
| + | Double members\\ | ||
| + | Wood shores\\ | ||
| + | Form design Using the Tables\\ | ||
| + | Design tables\\ | ||
| + | * [[fabwiki: | ||
| + | - General layout and detail drawings\\ | ||
| + | - Check list of details\\ | ||
| + | - Recheck of structural drawings\\ | ||
| + | - Drawing approval\\ | ||
| + | [[fabwiki: | ||
| + | Carpentry Shop and Job Mill\\ | ||
| + | Footings\\ | ||
| + | Slab on grade and paving work\\ | ||
| + | Wall forms\\ | ||
| + | Column forms\\ | ||
| + | Beam or girder forms\\ | ||
| + | Slab forms\\ | ||
| + | Shoring and Scaffolding\\ | ||
| + | * [[fabwiki: | ||
| + | - Foundations\\ | ||
| + | - Piers\\ | ||
| + | - Pier caps and tie struts\\ | ||
| + | - Superstructures\\ | ||
| + | - Arch bridges\\ | ||
| + | - Segmental box girder bridge construction\\ | ||
| + | - Making precast bridge segments\\ | ||
| + | [[fabwiki: | ||
| + | Placing reinforcement and inserts\\ | ||
| + | Preparation for concreting\\ | ||
| + | Inspection and form watching\\ | ||
| + | Placing and vibrating-effect on formwork\\ | ||
| + | Removal of forms and shores\\ | ||
| + | Reshoring\\ | ||
| + | Care and storage of forms and accessories\\ | ||
| + | Cold weather protection\\ | ||
| + | [[fabwiki: | ||
| + | Specifications: | ||
| + | Architectural formwork design\\ | ||
| + | Exposed concrete surfaces\\ | ||
| + | Construction of architectural forms\\ | ||
| + | Stripping\\ | ||
| + | Cleanup and repair\\ | ||
| + | #;; | ||
| + | < | ||
| + | |||
| + | ==== CONTENTS ==== | ||
| + | #;; | ||
| + | [[fabwiki: | ||
| + | Shell form design considerations\\ | ||
| + | Building the forms\\ | ||
| + | Placing concrete\\ | ||
| + | Form removal\\ | ||
| + | Inflated forming methods\\ | ||
| + | [[fabwiki: | ||
| + | Low lift formwork\\ | ||
| + | Handling, erecting, stripping\\ | ||
| + | Non-cantilevered formwork\\ | ||
| + | Roller-compacted mass concrete\\ | ||
| + | Foundations or starting lifts\\ | ||
| + | Curing, joint cleanup, insulation\\ | ||
| + | Planning and supervision\\ | ||
| + | Tolerances\\ | ||
| + | [[fabwiki: | ||
| + | Tunnel forming components\\ | ||
| + | Concrete placement methods\\ | ||
| + | General design considerations\\ | ||
| + | Form construction\\ | ||
| + | Stripping time\\ | ||
| + | Tolerances\\ | ||
| + | Shafts\\ | ||
| + | [[fabwiki: | ||
| + | Slipform construction\\ | ||
| + | Horizontal slipforms\\ | ||
| + | Traveling forms\\ | ||
| + | Tilt-up construction\\ | ||
| + | Lift method of construction\\ | ||
| + | Preplaced aggregate concrete\\ | ||
| + | Shotcrete\\ | ||
| + | Tremie concrete\\ | ||
| + | * [[fabwiki: | ||
| + | - Advantages of precasting\\ | ||
| + | - Formwork\\ | ||
| + | - Stripping\\ | ||
| + | - Erection and joints\\ | ||
| + | * [[fabwiki: | ||
| + | - Forms for post-tensioning\\ | ||
| + | - Forms for pre-tensioning\\ | ||
| + | [[fabwiki: | ||
| + | Acknowledgments\\ | ||
| + | Glossary\\ | ||
| + | Guide to Formwork for Concrete, ACI 347-04\\ | ||
| + | ACI 318-02 Code and Commentary-Chapter 6, Formwork,\\ | ||
| + | Embedded Pipes, and Construction Joints\\ | ||
| + | OSHA Regulations, | ||
| + | Index\\ | ||
| + | Metric Conversion Factors\\ | ||
| + | #;; | ||
| + | </ | ||
| + | |||
| + | |||
| + | |||
| + | | ||
| + | | ||
| + | | ||